MEP BIM Project For Stadium

  • BIM/VDC Services
Lead Designer

Olivia Bennett

Location

Dubai

Budget

$12 Million USD

Total Land Size

20,000 sq.m.

status

Completed in 2020-21

Advanced MEP BIM for a High-Capacity Sports Venue

A large-scale stadium project in Qatar and Dubai coordinated through advanced MEP BIM to ensure accuracy, efficiency, and zero-clash installation.

MaRS Design Studio successfully delivered a large-scale MEP BIM coordination project for a multi-purpose stadium located across Qatar and Dubai. Spread over 20,000 sq. m. with a project budget of $12 million USD, the scope involved complex mechanical, electrical, and plumbing systems integrated into a fast-track construction schedule.

Our BIM team provided detailed 3D modeling, clash detection, coordination, and constructability analysis for all MEP systems. The project demanded high precision due to the stadium’s scale, occupancy, and technical requirements. Through advanced BIM tools and workflows, we ensured error-free execution, optimized service routing, and enhanced collaboration between trades.

Project Challenges

Complex Service Routing Across Large Volumes
Stadiums have wide open areas and tiered seating, which made MEP routing across large spans and heights difficult. Coordinating ducts, cable trays, and piping through structural constraints required accurate modeling and real-time clash management.
Fast-Track Schedule and Multiple Stakeholders
With a tight construction timeline and several contractors involved, the challenge was to maintain updated models and respond quickly to on-site changes. Delays in coordination could impact the entire project timeline.
High-Density MEP Zones in Limited Spaces
Key service areas like plant rooms and utility corridors had high MEP density. This made spatial coordination critical, as even minor misalignments could cause installation issues and delays.

Our Solutions & Approach

We used BIM to coordinate all MEP systems in real-time, ensuring smooth integration with structural and architectural models. Our team focused on accuracy, efficiency, and clear communication with all stakeholders.

Delivered LOD 400 BIM models for all MEP trades
Ran weekly clash detection reports and coordination meetings
Optimized service routes for accessibility and installation
Provided as-built BIM for post-construction use and maintenance

55 m2

Bedroom.

Sed urna eros, venenatis et suscipit nec, laoreet vel felis. Curabitur sit amet elementum erat, sed tempus ante. Praesent ullamcorper orci quis arcu scelerisque auctor. Duis congue commodo ornare.

Etiam efficitur elit ac ipsum egestas porta.
Maecenas varius magna quis velit suscipit dictum.
Quisque pulvinar lacus ut ex pulvinar scelerisque.

Customers talk about the project

PREVIOUS PROJECT
NEXT PROJECT
Prev
Next